Showing posts with label Kent and East Sussex. Show all posts
Showing posts with label Kent and East Sussex. Show all posts

Saturday, 4 February 2017

East Sussex rural idyll

BODIAM






(All pics 18.4.1976 copyright Steve Sainsbury/Rail Thing)



The Kent and East Sussex Railway had quite a struggle to survive. The original line closed to passengers in 1954, with the section north from Tenterden to Headcorn closing completely, the rest of the line followed in 1961. Track remained in situ though and the line was eventually opened in stages from Tenterden westwards, but only after an epic struggle with the Minister of Transport, who refused the line permission to cross the main A22 with a level crossing just short of its junction with the main Tonbridge-Hastings line at Robertsbridge. This section is now being restored by the Rother Valley Railway which plans to make an end-on junction with the KESR in the future.

This was all in the air when I visited in 1976. What I found was a rather ramshackle station at Bodiam which hasn't seen any public trains since 1961. It had a real air of Colonel Stephens (which I imagine is lost now) and was set in pleasant countryside. It's currently the terminus for trains from Tenterden, the nearby castle being a big draw for passengers.



Thursday, 5 June 2014

Weston, Clevedon and Portishead Railway


WICK ST LAWRENCE














I was always fascinated by the Colonel Stephens railways. I was lucky enough to have grown up quite close to one (the Selsey Tramway) and at the other end of Sussex another Colonel Stephens' line was being restored - the Kent and East Sussex.

But one of the most fascinating of all Colonel Stephens lines was the Weston, Clevedon and Portishead Railway, which linked the three seaside towns in its title. It struggled on until 1940 but from a 21st century perspective it seems odd that it did ever struggle! The three main towns are busy seaside resorts and should have easily provided enough business. One issue was that all three towns had branches to the main GW line from Bristol to Exeter, and this may well have sucked a lot of potential traffic away. The station at Weston was inconveniently sited, it would have been far better if the original tram-style route into Weston had been operated. It was built but there were, even back then, objections, and the track was lifted without being used.

So the line struggled on under the weight of the issues above, and closed during World War Two, in 1940.

Today there is an active group that doesn't rule out rebuilding part of all of the route. If that goes ahead the chances are the new line would be more heritage than modern, which is a shame, but any railway is better than none at all. Imagine being able to catch a modern tram (or even a steam train) from Weston and taking a leisurely trip across the marshes through Clevedon and on to Portishead, where the old GW branch is now under restoration. What an extra attraction that would be for the resorts, which really do need a USP! As with most of the Colonel Stephens line, the WC&P was a hundred years ahead of its time ...


BUY SOMERSET'S LOST RAILWAY (profits to New S&D!)

Further information (from Wikipedia)

The WC&PR was originally proposed as a standard gauge tramway in 1884 by the Weston-Super-Mare, Clevedon & Portishead Tramways Company to link the three small coastal towns. The line was planned to run on the street along the Boulevard in Weston-super-Mare and from there off-road apart from numerous road crossings all of which were to be on the level. An Act of Parliament to authorise the construction of the railway was passed on 6 August 1885.

Building of the Weston-super-Mare to Clevedon section of the railway began in 1887 but due to various legal and financial problems, progress was very slow, and the time limit of the Act expired requiring further Acts to be passed on 25 July 1890 and December 1891. Due to these delays some of the track had to be re-laid before the line opened because sleepers had rotted. The track along the Boulevard in Weston-super-Mare was taken up before the line opened due to complaints from the council. The section finally opened on 1 December 1897. Two years after the opening, the tramway was designated a light railway and the name was changed to the Weston, Clevedon & Portishead Light Railway Company.

Portishead extension


The location of Clapton Road Halt near Portishead.

The extension to Portishead had been planned from the beginning, but financial constraints delayed its construction. It required another Act of Parliament, which was passed in August 1899, There were many objections to the proposed extension, one of which was that the line was to run through the streets in Clevedon. These objections were overcome, but a man with a flag had to lead trains across the street at 4 mph. The extension to Portishead was built as a light railway and opened on 7 August 1907.

Other features

Links to the Great Western Railway were provided at Clevedon and Portishead, and in 1915 a short branch to a wharf at Wick St. Lawrence on the River Yeo was built. Sidings served three stone quarries in the Gordano Valley.

Wednesday, 23 January 2013

alresford 1976












 
(All 24.6.1976 copyright Rail Thing)
 
Back in 1976 Alresford had not long been part of the Watercress Line and I don't think trains were running at this time. Whilst there is a Southern tender engine all the other locos on site were industrials. It's sometimes easy to forget that many of today's flagship lines started off very small and some didn't even make it (though 97% did!) Of course back in the 70s, or at least in the first half of the decade, there were still a few lines being closed by BR, which is perhaps easier than rebuilding a line from the trackbed up, but remember that the track through Medstead HAD been lifted at this time (photos will follow!)
 
When I hear people today questioning the viability of new build lines I think they need to remember that some of our biggest and busiest lines nearly didn't make it. Swanage struggled for years and all the track was lifted. The Kent and East Sussex had terrible problems with level crossings. The Festiniog lost part of its line under a reservoir. All were overcome.
 
The Third Wave of railways is now happening. These are lines that mainly closed before 1970 and have been lifted. Most of these new schemes have a community railway element, some (like the Waverley) have even been taken over by governments and built. The S&D of course falls into this category and who would have thought that this line now has a group that plans to restore the whole route, and that there are now five separate restoration and operating sites along the line?
 
I think it's a good idea to sometimes look back at the early days of some of the stars of the heritage (1st and 2nd wave) restorations!